作者:P. Barabaschi , Y. Kamada ...
来源:[J].Nuclear Fusion(IF 2.734), 2019, Vol.59 (11)IOP
摘要:The JT-60SA project was initiated in June 2007 under the framework of the Broader Approach Agreement and Japanese National Fusion Programme for an early realization of fusion energy by conducting supportive and complementary work for the ITER project towards supporting the basis ...
作者:P. Barabaschi , A. Cucchiaro ...
来源:[J].Nuclear Fusion(IF 2.734), 2015, Vol.55 (8)IOP
摘要:The most distinctive feature of the superconducting magnet system for JT-60SA is the optimized coil structure in terms of the space utilization as well as the highly accurate coil manufacturing, thus meeting the requirements for the steady-state tokamak research: a conceptually n...
作者:P. Barabaschi , Y. Kamada
来源:[J].Nuclear Fusion(IF 2.734), 2017, Vol.57 (10)IOP
摘要:The JT-60SA project has been implemented for the purpose of an early realization of fusion energy. With a powerful and versatile NBI and ECRF system, a flexible plasma-shaping capability, and various kinds of in-vessel coils to suppress MHD instabilities, JT-60SA plays an es...
作者:P. Barabaschi , S. Ishida ...
来源:[J].Nuclear Fusion(IF 2.734), 2011, Vol.51 (7), pp.073011 (11pp)IOP
摘要:The JT-60SA device has been designed as a highly shaped large superconducting tokamak with a variety of plasma actuators (heating, current drive, momentum input, stability control coils, resonant magnetic perturbation coils, W-shaped divertor, fuelling, pumping, etc) in orde...
作者:P. Barabaschi , Y. Kamada
来源:[J].Nuclear Fusion(IF 2.734), 2011, Vol.51 (9), pp.094018 (12pp)IOP
摘要:This paper overviews the achievements and plans of the JT-60SA project which has been implemented jointly by Europe and Japan since 2007, covering the objectives, performance, schedule, design and procurement activities and on-site preparations. Re-baselining of the project was c...
作者:P. Barabaschi , S. Ishida ...
来源:[J].Nuclear Fusion(IF 2.734), 2013, Vol.53 (10)IOP
摘要:The JT-60SA project implemented by Japan and Europe is progressing on schedule towards the first plasma in March 2019. After careful R&D, procurements of the major components have entered their manufacturing stages. In parallel, disassembly of JT-60U has been completed on ti...