全部文献期刊学位论文会议报纸专利标准年鉴图书|学者科研项目
中外文文献  中文文献  外文文献
作者:... Raheb Bagherpour , Reza Mikaeil , Yilmaz Ozcelik
来源:[J].Bulletin of Engineering Geology and the Environment(IF 0.617), 2017, Vol.76 (4), pp.1593-1607Springer
摘要:Predicting the wear rate of diamond beads in the diamond wire sawing process is one of the most important factors in the optimized design and cost estimation of quarrying. This paper aims to predict the wear rate of diamond beads as one of the principal performance criteria ...
作者:Reza Mikaeil , Yilmaz Ozcelik
来源:[J].Geotechnical and Geological Engineering, 2017, Vol.35 (4), pp.1311-1326Springer
摘要:One of the key parameters that affect the selection of equipment and the cost estimation of dimension stone quarries is the rock cutting rate or production rate. In this study, the M5P tree algorithm is used to determine the relationship between the hard rock sawability and ...
作者:Reza Mikaeil , Sami Shaffiee Haghshenas ...
来源:[J].Measurement(IF 1.13), 2019, Vol.146, pp.159-170Elsevier
摘要:Abstract(#br)The process of cutting dimension stones by gang saw machines plays a vital role in the productivity and efficiency of quarries and stone cutting factories. The maximum electrical current (MEC) is a key variable for assessing this process. This paper proposes two...
作者:Reza Mikaeil , Mohammad Ataei
来源:[J].International Journal of Refractory Metals and Hard Materials(IF 1.858), 2019Elsevier
摘要:Abstract(#br)Drilling is an important engineering operation with extensive application in many fields of industry including mining engineering, oil and gas exploration and exploitation, civil engineering, groundwater management, etc. Drill bits must be able to endure enormou...
作者:Reza Mikaeil , Mohammad Ataei , Reza Yousefi
来源:[J].Arabian Journal of Geosciences(IF 0.74), 2013, Vol.6 (1), pp.115-121Springer
摘要:Abstract(#br)The prediction of production rate in ornamental stones sawing is very important in cost estimation and process planning of the rock sawing plants. The main aim of this paper is finding a mathematical correlation between production rate and rock brittleness indexes. T...
作者:Reza Mikaeil , Sina Shaffiee Haghshenas , Zoheir Sedaghati
来源:[J].Natural Hazards(IF 1.639), 2019, Vol.97 (3), pp.1099-1113Springer
摘要:Abstract(#br)Tunneling projects are generally complex projects with numerous affective factors, including variable and unreliable conditions of the land. One of the appropriate tools for conducting a successful project is the implementation of risk management during its lifetime....
作者:Akbar Salemi , Reza Mikaeil , Sina Shaffiee Haghshenas
来源:[J].KSCE Journal of Civil Engineering(IF 0.383), 2018, Vol.22 (5), pp.1978-1990Springer
摘要:Abstract(#br)In this study, it is aimed to investigate the behavior of the concrete lining of circular shallow tunnels in sedimentary urban areas under seismic loads using integration of numerical and metaheuristic techniques. The Tabriz Urban Railway (TUR) Tunnel is used as a ca...
作者:Mohammad Ataei , Sadjad Mohammadi , Reza Mikaeil
来源:[J].Journal of Central South University(IF 0.434), 2019, Vol.26 (7), pp.1934-1945Springer
摘要:Abstract(#br)The performance of cutting machines in terms of energy consumption and vibration directly affects the production costs. In this work, our aim was to evaluate the performance of cutting machines using hybrid intelligent models. For this purpose, a systematic experimen...
作者:Reza Mikaeil , Yilmaz Ozcelik ...
来源:[J].International Journal of Rock Mechanics and Mining Sciences(IF 1.2), 2013, Vol.58, pp.118-126Elsevier
摘要:Abstract(#br)The main purpose of this study is to compare the many different rock properties in the rock sawability. The comparison was realized with the combination of the analytic hierarchy process (AHP) and Fuzzy Delphi method and also TOPSIS method. The analysis is one o...

我们正在为您处理中,这可能需要一些时间,请稍等。

资源合作:cnki.scholar@cnki.net, +86-10-82896619   意见反馈:scholar@cnki.net

×