作者:Stefan Creemers , Bert De Reyck , Roel Leus
来源:[J].European Journal of Operational Research(IF 2.038), 2015, Vol.242 (2), pp.465-476Elsevier
摘要:Abstract(#br)We investigate project scheduling with stochastic activity durations to maximize the expected net present value. Individual activities also carry a risk of failure, which can cause the overall project to fail. In the project planning literature, such technologic...
作者:... Yael Grushka-Cockayne , Zeger Degraeve , Bert De Reyck
来源:[J].European Journal of Operational Research(IF 2.038), 2015, Vol.244 (3), pp.892-904Elsevier
摘要:Abstract(#br)Managerial flexibility can have a significant impact on the value of new product development projects. We investigate how the market environment in which a firm operates influences the value and use of development flexibility. We characterize the market environment a...
作者:Michail Chronopoulos , Bert De Reyck , Afzal Siddiqui
来源:[J].European Journal of Operational Research(IF 2.038), 2014, Vol.236 (2), pp.643-656Elsevier
摘要:Abstract(#br)A monopolist typically defers entry into an industry as both price uncertainty and the level of risk aversion increase. By contrast, the presence of a rival typically hastens entry under risk neutrality. Here, we examine these two opposing effects in a duopoly s...
作者:Erik Demeulemeester , Bert De reyck , Willy Herroelen
来源:[J].IIE Transactions(IF 1.287), 2000, Vol.32 (11), pp.1059-1069Springer
摘要:Abstract(#br)In many solution methods for resource-constrained project scheduling, it is assumed that both the duration of each activity and its resource requirements are known and fixed. In real-life projects, however, it often occurs that only one renewable bottleneck resource ...
作者:Pascale Crama , Bert De Reyck , Zeger Degraeve
来源:[J].European Journal of Operational Research(IF 2.038), 2013, Vol.224 (3), pp.572-582Elsevier
摘要:Abstract(#br)We examine how a licensor can optimally design licensing contracts for multi-phase R&D projects when he does not know the licensee’s project valuation, leading to adverse selection, and cannot enforce the licensee’s effort level, resulting in moral hazard. We fo...