美国土木工程师学会期刊
期刊
会议
图书
作者:Kimiya Zakikhani , Fuzhan Nasiri , Tarek Zayed
来源:[J].Journal of Pipeline Systems Engineering and Practice, 2020, Vol.11 (1)ASCE
摘要:AbstractOver 10,000 failures have occurred in US oil and gas pipelines in the past 15 years, highlighting the significance of safety measures for such facilities. Various models have been proposed by researchers to predict different failure parameters. Despite such efforts, ...
作者:Salih Yildiz , K. T. Ikikardaslar , Hasun Khan
来源:[J].Practice Periodical on Structural Design and Construction, 2020, Vol.25 (1)ASCE
摘要:AbstractTapered beams are extensively used for structural applications due to their high stiffness-to-mass ratio. They provide many advantages over prismatic beams such as better shear carrying capacity, higher lateral stability, and weight savings. As it is known, axial str...
作者:Sachith Jayasuriya , Behrouz Chegeni , Sreekanta Das
来源:[J].Journal of Pipeline Systems Engineering and Practice, 2020, Vol.11 (1)ASCE
摘要:The feasibility and effectiveness of basalt fiber reinforced polymer (BFRP) wrap in the rehabilitation of corroded pipes under bending and internal pressure was investigated by using experimental tests and numerical analyses. The experimental program consisted of eight pipe speci...
作者:Agnieszka Malesińska , Mariusz Wojciech Rogulski , Pierfabrizio Puntorieri ...
来源:[J].Journal of Pipeline Systems Engineering and Practice, 2020, Vol.11 (1)ASCE
摘要:This paper presents the results of studies of water hammer phenomena in a physical model in combinations of two and three pipelines connected in series. The combined pipelines were made of steel and polypropylene. Pipelines made of one material type were connected in series in di...
作者:Yu Zhang , Bo Wang , Xinjing Huang
来源:[J].Journal of Pipeline Systems Engineering and Practice, 2020, Vol.11 (1)ASCE
摘要:AbstractTraditional optimization methods of heated oil pipeline operation are usually offline or nondynamic, where steady-state models or complex and inaccurate physical models are utilized. To achieve online optimization with high adaptability and timeliness, this paper dep...
作者:Jung Hyun Lee , Yashovardhan Jallan , Baabak Ashuri
来源:[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2020, Vol.12 (1)ASCE
摘要:AbstractAssuring quality management is essential for a project’s success for a specific price and within a specific time period. With an increasing number of highway projects being delivered by the design-build (DB) project delivery system, conducting quality assurance (QA) ...
作者:Mounir El Asmar , David Ramsey , G. Edward Gibson ...
来源:[J].Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2020, Vol.12 (1)ASCE
摘要:AbstractDesign-build (DB) is an alternative project delivery method that has been used to great effect in transportation project delivery. Measuring the performance of DB projects has been the subject of many research studies. However, the collective results of these studies...
作者:Duygu Kalan , Mehmet Egemen Ozbek
来源:[J].Practice Periodical on Structural Design and Construction, 2020, Vol.25 (1)ASCE
摘要:Given the increasingly competitive environment in the construction industry, investigating the bidding strategies and the influential factors on bidding decisions has become a topic of research since the mid-1950s. To date, numerous decision-making tools have been developed to as...
作者:Yue Choong Kog
来源:[J].Practice Periodical on Structural Design and Construction, 2020, Vol.25 (1)ASCE
摘要:The in situ concrete compressive strengths estimated by core tests and nondestructive tests (NDTs) are influenced by various factors, such as level of quality control for concreting operation, carbonation of the concrete surface, and stress history. Most studies of the effec...
作者:Sharareh Kermanshachi , Elnaz Safapour
来源:[J].Practice Periodical on Structural Design and Construction, 2020, Vol.25 (1)ASCE
摘要:Practitioners and researchers involved in DOT projects frequently face challenges associated with cost overruns that lead to disagreements between stakeholders and decrease the accuracy of construction cost estimates. To address this issue, this research project identified s...

我们正在为您处理中,这可能需要一些时间,请稍等。

资源合作:cnki.scholar@cnki.net, +86-10-82896619   意见反馈:scholar@cnki.net

×